
Restoration & Repairs
Failed Wall Rebuild
Windham, NH · Completed 2025
Size
260 face sq ft
Timeline
9 working days
Budget range
$18,000 – $26,000
Completed
2025
The build
The homeowners had paid for this wall in 2020. By 2025 it had rotated out three inches at the top and separated at the corner.
Our inspection point found native soil backfilled straight against the block face — no clean stone, no drain pipe, no geogrid. Nothing about the front of the wall was the problem.
We took it down, kept every reusable block, excavated the reinforced zone, and rebuilt it properly. Same look, different structure, and it carries our 5-year workmanship warranty.
Materials & specification
- Original block reused where sound
- Clean stone drainage chimney
- Filter-wrapped perforated drain
- Geogrid reinforcement
Before & after
Where this one started


More restoration & repairs
View all projects →Want something like failed wall rebuild?
Tell us your address and roughly what you're picturing. We'll walk the site and give you a real number.


