
Walkways & Steps
Driveway Apron & Border
Derry, NH · Completed 2025
Size
380 sq ft
Timeline
4 working days
Budget range
$12,000 – $17,000
Completed
2025
The build
The clients weren't ready to replace the whole driveway but wanted the front of the house to look finished.
A paver apron at the street and a border running the length of the drive gave them most of the visual effect at a fraction of a full replacement.
Built on a full vehicular base with 80mm pavers so it handles the same loads the rest of the drive does.
Materials & specification
- 80mm concrete pavers
- Contrasting soldier-course border
- Vehicular-depth base
Want something like driveway apron & border?
Tell us your address and roughly what you're picturing. We'll walk the site and give you a real number.



